Functions:
1, PLC controlling system, touching screen operation;
2, World famous brands of key components, ensure stable operation and long service life;
3, Advanced desiccant loading device adopts air flow principle;
4, Automatic desiccant supplement function;
5, Adjustable filling height;
Parameters of Desiccant filling machine |
Power supply |
220V 50Hz (or customized) |
Total power |
|
0.5KW |
Working parameters |
Aluminum spacer width |
5.5-26.5mm |
Filling speed |
5-10sec/pcs |
Air pressure |
0.5-0.8MPa |
Max filling size |
2000x2000mm |
Dimension |
L×W×H (mm) |
1050×1000×4000 |
Gas filling machine
Automatic sealing line is special designed for insulating glass production line, which work instead of hand sealant, greatly improve working efficiency and ensure quality of IG glass sheet.
1. It is special equipment for gas charging in insulating glass production.
2. Available for aluminum spacer insulating glass and rubber strip insulating glass.
3. Adopting imported microcomputer controller and high quality components, the equipment are automatically, stable and reliable.
4. With compact size and four universal wheels on the base, it is flexible and convenient in use.
5. It can charge four units of glass at a same time.
1. Auxiliary equipment for insulating glass processing, argon gas filling machine.
2. This machine is used for filling argon gas into insulating glass.
3. Automatic display the work process, to indicate the gas filling be finished or not.
4. 4 pieces of insulating glasses could be finished once.
5. Easy movement in workshop.
Power voltage |
220V |
Power frequency |
50HZ |
Total power |
0.1KW |
Maximum number of insulating glass |
4 PCS |
Volume of argon flow |
0-15L/min |
Overall dimensions |
810 x 420 x 760mm |
Weight |
80kg |
Was founded in January 2008. The company is headquartered in Jinan, a beautiful spring city, with convenient
transportation and superior geographical location. With a reqistered capital of 10 million yuan, the company has invested
in the construction of a 20000 square meter standardized factory building, which has passed the acceptance of the
national safety assessment and environmental assessment, and meets the requirements of the state for environmental
assessment, safety inspection and fire control. The company has 89 employees, including 21 employees with senior
technical titles, 10 invention patents and new use patents, 8 works registration, 21 various
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral carton and wooden case. We also can pack the goods
according to your instruction including out package and kinds of labels.
Q2. How about your delivery time?
A: Generally, it will take 5 to 7 working days after receiving your advance payment. The specific delivery
time depends on the items and the quantity of your order.
Q3.What is your terms of payment?
A: Usually do T/T, L/C or Western Union,T/T 30% as deposit, and 70% before delivery. We'll show you the
photos of the products and packages before you pay the balance.
Q4. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q5. Do you test all your goods before delivery?
A: Yes, but you will be always welcome to our company to inspect the goods before delivery.